Accelerated Bridge Construction Techniques Using Prefabricated and Pre-Assembled Structural Systems

Sevak Demirdjian, Vice President, Major Projects, SNC Lavalin Inc. and Adel R. Zaki, Vice President/Chief Engineer, SNC Lavalin Inc.
Sevak Demirdjian, Vice President, Major Projects, SNC Lavalin Inc.

Sevak Demirdjian, Vice President, Major Projects, SNC Lavalin Inc.

Rationale for Implementing ABC Techniques for a Sustainable Bridge Construction

ABC Techniques have been used by SNC-Lavalin engineers throughout the years to ensure world-class bridge construction. Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques are made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives, long detours, and means and methods. The author has selected in this article, several structures where innovation and sustainability are paramount. Two major project applications are presented. The first consists of a new construction for two projects: an elevated roundabout and the new Champlain Bridge. The second describes the reconstruction of a footbridge and the replacement of bridge decks through different structural techniques.

Construction of an Elevated Roundabout

This is a complex geometry project located in a highly urbanized area. The project includes the relocation of public utilities, demolition of existing structures, construction of new structures and new roadways, and preparation of temporary roads and alternate itineraries for highway traffic, public transport, and pedestrian traffic. The elevated structure was constructed over a major highway in phases to maintain traffic flow.

Construction of a Footbridge

The construction entails the replacement of an existing footbridge. The ABC technique was implemented, which comprises HPC precast pre-stressed elements offering the most economical solution. The bridge spans 35m. The cross-section consists of two Z-shaped pre-cast girders with the shape providing a bottom ledge for supporting the pre-cast panels for the deck slab.

Adel R. Zaki, Vice President/Chief Engineer, SNC Lavalin Inc.Reconstruction of the Jacqus-Cartier Bridge Deck Replacement–Integral Deck Floating System

Measuring 2.70 km span crossing a major river, with five lanes of traffic, this bridge carries more than 43 million vehicles every year, making it one of the busiest bridges in North America on a per lane basis. The ABC Technique for deck replacement was developed based on the following main objectives:

• Minimize inconveniences to as many users as possible

• Construct a highly durable deck (design service life greater than 50 years)

• Minimize negative impacts on the environment

Reconstruction Of Princess Margaret Bridge–Intergral Deck, Composite Action The Princess Margaret Bridge provides an elevated crossing over a major river, measuring 1097 m in overall length. It is a high-level structure supported on tall, slender piers to provide the required 23± m clearance for the center navigation span. The roadway is supported by nine deck truss spans, one through-truss navigation span, seven Plate Girder spans, and six Rolled Beam approach spans.

A composite section was created between the deck slab and the steel members. This composite action tremendously improved the capacity of those members and therefore reduced the need for strengthening.

Composite actions were created between the deck panels and top chord steel truss. The composite actions to the steel members were achieved through a spine beam that was detailed to connect either the Plate Girder top flange or the Deck Truss top chord to the deck panels after the post-tensioning operations.

New Champlain Bridge Corridor Crossing The St-Lawrence River

On October 5, 2011, the Government of Canada announced the replacement of the Champlain Bridge, one of the busiest crossings in Canada, carrying between 40 and 50 million vehicles per year.

The asymmetric, cable-stayed bridge features a 155-meter-high concrete tower and stay cables in a harp arrangement, an aesthetic element that designers felt would bolster the bridge’s place amongst the architecture of the cityscape. The three-corridor design of the project includes two three-lane roadways, a multi-use path for pedestrians and cyclists, as well as a two-lane transit artery that will accommodate a light-rail system. The overall construction timeline was a tight 42 months, which made for an accelerated schedule. Consequently, pre-cast elements played a major role in project planning and execution. Offsite pre-fabrication took some pressure off the on-site construction teams so that crews could focus more directly on other construction components. Heavy gravity-based footing and pier starters for in-water approach spans with units weighing 800 to 900 metric tons were pre-fabricated on-site at a temporary pre-casting plant installed on an adjacent jetty. The units were then delivered to their final location using a custom-built gantry mounted on a large catamaran barge. The accelerated construction strategy was key to meeting the delivery schedule.

Conclusion

Accelerated techniques for bridge construction should be used where the benefits have effects on the construction costs. This modern technology was used to implement innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce on-site construction. Decisions to use accelerated bridge construction techniques were made after considering the specific factors, mainly temporary roadways, temporary retaining structures, environmental impacts, sustainable development, user costs, social and financial prerogatives. In this article, the author has selected several bridge structures where the Accelerated Bridge Construction techniques were applied.

Read Also

Balancing Innovation and Standardization

Balancing Innovation and Standardization

Matt Kuhn, PhD, Chief Technology Officer, Innovative Technology Services, Thompson School District
Leveraging Quality Engineering and DevOps to thrive in the face of churning customer expectations

Leveraging Quality Engineering and DevOps to thrive in the face of...

Michelle DeCarlo, senior vice president, enterprise delivery practices, Lincoln Financial Group
Pioneering the Future Through Technology Innovation

Pioneering the Future Through Technology Innovation

Eric Kunnen, Senior Director, IT Innovation and Research, Information Technology, Grand Valley State University
Reimagine Naval Power

Reimagine Naval Power

Lorin Selby, Chief of Naval Research, Office of Naval Research
The Shifting Enterprise Operating System Ecosystem Is Helping Warehouse Operations Evolve

The Shifting Enterprise Operating System Ecosystem Is Helping...

Tom Lee, Director Sales Engineering, Zebra Technologies
Digital TRANSFORMATION: Challenge the Status Quo, Be Disruptive.

Digital TRANSFORMATION: Challenge the Status Quo, Be Disruptive.

Michael Shanno, Head of Digital Transformation, Global Quality, Sanofi